Town of Sullivan's Island logo
Sullivan Island intracoastal waterway

Town of Sullivan’s Island

Capital Projects

Investing in Sullivan’s Island’s future

Capital projects are long-term investments in the infrastructure, public spaces, and amenities that serve Sullivan’s Island. From drainage improvements that help protect neighborhoods from flooding to investments in parks and beach access, these projects preserve the Island’s quality of life today while preparing the community for the future.

Capital Projects Tracker

Take a closer look at the Town's new Capital Projects Tracker application. View all projects by map overview or by individual project description.

https://cleargov.com/app/tr/229772/capital-project/12604

Capital Improvement Projects & Equipment
sullivans island marsh

Infrastructure + resilience

Stormwater Improvements

Protecting neighborhoods and strengthening long-term resilience.

• $10 Million SCIIP Grant: Stormwater improvements in the Station 16, 25, 28½, and 31 drainage basins.

• $5.5 Million HMGP 4241 Award: Stormwater improvements serving the Station 18 and 19 drainage basins.

• $300,000 HMGP 4492 Award: Improvements within the Station 19 and 25 drainage basins.

• Station 18 Pump House Rehabilitation: Restored a major stormwater pumping facility.

• Osceola Avenue & Station 9½ Outfall Improvements: Reconstructed the outfall and improved drainage conveyance.

• Stith Park Drainage: Developed and began implementing a comprehensive drainage strategy for the Town's primary recreational facility.

nature trail

Community + recreation

Stith Park Drainage Improvements

Planning for the next generation of a community gathering place.

The Stith Park drainage improvements include redesigning and constructing necessary drainage for the entire parcel dedicated to Stith Park playgrounds, fields, and courts. These changes will set the stage for years to come and allow future COuncils to implement the various elements of the Stith Park Master Plan.

The total project cost is $1,100,000 for permitting and construction of the initial drainage phase.

sullivans island beach at dusk

Access + public space

Accessible Beach Access

Expanding access to one of Sullivan’s Island’s most important public resource.

Annually, the Town focuses on the reconstruction of beach boardwalks, for the purpose of improving access to the beach for residents and visitors of all abilities.

In FY2027 the planned investment in reconstruction of the Station 22 Boardwalk is approximately $470,000.

Explore the Stormwater Project

View Project Details

Explore the Stith Park Plan

View Project Details

Learn More About Beach Access

View Project Details

Police Department Vehicle and Equipment Investments

Public safety + resilience

Police Department Investments

• Upgrade to APX N70 radios to support modern law enforcement communications and officer safety

• Implement VectorSolutions scheduling software to replace outdated Excel-based schedules

• Polaris Ranger XP1000 UTV

• Two F150 Trucks

• Replace outdated laptops (MDTs), desktop computers, and BSO tablets

• Implement CivicEye Records Management System (RMS) and CivicCase Court module

Scott Air pack

Public safety + resilience

Fire & Rescue Investments

• Replace our outdated Self-Contained Breathing Apparatuses (SCBA) on all our Engines and Tower Trucks with one spare on C-1202 (19 Packs, 2 cylinders per pack and 3 RIT Bags)

• 2027 Expedition to replace current 2021 Expedition (C-1202)

Brake lathe

Vehicle Maintenance + asset management

Fleet Maintenance Investments

• Purchase of the Robinair Air Conditioning Recovery Machine (1234YF) will allow fleet maintenance to reduce and or eliminate the need to send out town vehicles with A/C issues or concerns.

• Purchase of The Hunter Bench Lathe will give The Town of Sullivan’s island the immediate benefits of reduced cost of brake jobs/ concerns, reduced downtime and quicker service for brake jobs.

back beach

Natural Resources + resilience

Planning, Building & Resilience Department

• Establish an invasive species removal program in the maritime forest and across the island

• Invest in remote monitoring equipment to protect areas of the forest that have undergone impacts associated with the destruction of native vegetation and to track the movement of wildlife.

IT

Information technology + resilience

Administration Department

• Established a new managed IT services partnership with VC3, including dedicated onsite support.

• Implemented a cloud-based GoTo phone system, providing greater flexibility and remote communications capability during emergencies or evacuations.

• Established fiber-optic connectivity to Town Hall and upgraded internet bandwidth.

• Replaced Town Hall and Police Department servers.

• Replaced the Town's firewall with a SonicWall TZ 570.

• Migrated permitting, financial, personnel, and billing functions to BS&A Cloud, reducing dependence on local servers and improving remote access.

• Added Wi-Fi connectivity at the rear of Town Hall for Police Department vehicles.

• Upgraded Council Chambers with new wiring and audio/visual equipment, including speakers, projector, and microphones.

• Implemented cybersecurity training through the SLED Homeland Security Grant.

• Planned installation of Starlink satellite connectivity as part of the FY2027 Capital Budget.

FLAT COLOR BACKDROP

Example: Stormwater improvements

$10 million

state infrastructure grant

Want to go deeper?

This page tells the financial story. Detailed engineering plans, construction updates, project documents, and additional Town projects remain available on the Town’s project website.

Explore all Town Projects →